CFS/K-130
For Cavity widths 130-145mm
Place mortar bed on top of blockwork before floor units are laid to provide even distribution of load. Steel Lintels may be propped to facilitate speed of construction.
Click to Copy Architect Specification
![]() |
![]() |
![]() |
![]() |
---|---|---|---|
Length (mm) | Height
(mm) |
Thickness
(mm) |
Total UDL
kN 19:1 |
600 2400 |
229 | 2.5 | 48 |
2550 3600 |
229 | 3.0 | 50 |
3750 4800 |
229 | 3.0 | 38 |
[[[["field18","contains","Customer Support"]],[["show_fields","field12,field5,field11,field22,field23"]],"and"],[[["field18","contains","Document Request"]],[["show_fields","field12,field8,field11,field22,field23"]],"and"],[[["field18","contains","Upload Plans"]],[["show_fields","field12,field14,field11,field22,field23,field24"]],"and"],[[["field21","equal_to","Northern Ireland"]],[["email_to",null,"info@keystonelintels.co.uk"]],"and"],[[["field21","equal_to","Great Britain"]],[["email_to",null,"info@keystonelintelsuk.com"]],"and"],[[["field21","equal_to","Republic of Ireland"]],[["email_to",null,"info@thekeystonegroup.ie"]],"and"],[[["field23","equal_to","I wish to receive product information, promotional material and offers from Keystone Lintels in the future."]],[["trigger_integration",null,null,"MailChimp"]],"and"]]
1
Step 1